Thursday, 6 November 2014

Filming Schedule

I will be filming my music video on Sunday the 9th of november. This post will run down how the day will proceed, and where filming and times will take place. This has been done in order to make the filming process more efficient, so can film it all.

9.30  -      I will start to prepare everything that is needed for the day, which includes the costumes for                characters, the filming equipment, ladder, and any other props.

10 -        Actors will arrive, and will run through the day, and what will be done. (Introduction). 

10.30 -   All shots filmed by the 'wall' will be filmed, a total of about 7.

11 -        All shots filmed in the woods will be filmed, a total of about, 25.

11.45 -   Break from filming in the woods.
12.15 -   Filming in the woods resumes.

1 -          Lunch break.

2 -         All other shots which are taken place in the garden will be taken, about 7.

2.45 -    Break.

3.30 -    Any uncompleted shots, or shots with problems can be re-done. 



No comments:

Post a Comment